For cement plaster there are following steps.
Step 1.
First of all take measurements normally we take measurements for cement plaster in Sft or Sqm .
Lenght *Height
For example we calculating cement plaster 10 *10 ft = 100 sft
We need to convert this quantity in to cft for this we multiple this quantity with thickness of plaster like if plaster laying in thickness of 3/4"
100*0.06 = 6cft
3/4" = 0.06 ft
Step 2.
This quantity is wet martial quantity we need dry material quantity for calculate .
For dry quantity we multiple quantity with 1.27
6*1.27 = 7.62 cft dry material
Now we need ratio of cement plaster if ratio is 1:4
Sum of ratio is 1+4 = 5
For calculation of cement
1/5* 7.62 = 1.524 cft
now 1 bag of cement have 1.25 cft
1.22 bags or cement used in100 Sft 3/4 " thick plaster.
now 1 bag of cement have 1.25 cft
1.22 bags or cement used in100 Sft 3/4 " thick plaster.