Quantity Surveying/ Estimating
An art to collect data about material and cost required for a project is called
QUANTITY SURVEYING/ESTIMATING.
The Process of cost estimating is working out how much a building or other
construction will cost to make. The cost are usually divided into material and labour
cost..
TENDERING is the process of making a priced offer to construct the building. This is a
legally enforcable offer made within the conditions of the tender documention.
Necessary data for preparing an estimate of project are
- Drawings
- Specifications
- Rates.
Types of Estimate
A. Original Estimate
B. Repair Estimate